欢迎光临我们的网站!公司简介 | 联系我们

质邦阀门-专业生产加工、定做各种船用阀门和附件

上海质邦阀门制造有限公司
全国服务电话 全国服务电话 021-61553650
产品展示
联系我们
全国服务电话:021-61553650

传真:021-61553650

手机:13788995407

邮箱:sales@sh-zbfm.com

地址:上海市宝山区宝杨路1800号

The delivery of CIMC Raffles new victory five "jack up platform
发布时间:2017-09-24 01:11 来源:未知
In September 20th, Yantai CIMC offshore Co. Ltd for Sinopec Shengli Petroleum Engineering Company Limited the assembly construction "new victory five" jack up drilling platform delivered in Yantai CIMC Raffles base, Sinopec Group, China Veritas, CIMC Raffles and other leaders attended the ceremony.船用阀门www.sh-zbfm.com
"Victory five" platform 64.2 meters long, 62 meters wide, 8 meters deep, leg 127 meters high, the maximum operating depth of 90 meters, the maximum drilling depth of 9144 meters, to meet 120 people, can be suitable for the world wide 7-90 meters deep sea drilling, Shengli Petroleum Engineering fill the company at a depth of 50 meters - 90 meters blank construction area; platform for the first time use truss structure than the cylindrical platform can be adapted to the deeper waters, and to meet the conditions of standing while reducing the weight of its own platform; platform adds automatic pipe device, greatly reduces the labor intensity, can meet the more stringent ocean the environment and a higher standard of market demand for drilling, Shengli Petroleum Engineering Company set up a "type of reasonable structure, reasonable allocation of water depth" offshore oil iron and lay a solid foundation.
"Victory five" by Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Company Limited autonomy to complete the basic design, detailed design, complete the CIMC Raffles Design and production assembly and construction, the China Classification Society (CCS) and American Society (ABS). The platform from construction to delivery lasted more than a year, to achieve zero accidents of production safety, marine valve www.sh-zbfm.com NDT a test pass rate of 99.74%, the first ship inspection qualified rate 99.77%, and the cantilever land slip on the main hull, and platform leg before launching the land together and achieve the perfect control of key large-scale hoisting precision. The successful delivery is a major upgrade of Sinopec marine engineering equipment development and innovation ability, but also further consolidate, CIMC Raffles in drilling production, engineering and support complete marine equipment industry chain's competitive advantage. The Shengli offshore drilling platform has achieved a double breakthrough from the depth of 50 meters to 90 meters depth and from the cylindrical leg structure to the truss type structure".
"Victory five", as a key construction project of Sinopec, after delivery will be Shengli Petroleum Engineering Company has the largest size, supporting the most advanced first truss type offshore drilling platform for engineering, offshore oil and gas exploration and development operations.
CIMC Raffles and Sinopec cooperation has a long history, since 2009, CIMC Raffles has delivered 7 aircraft Sinopec drilling platform maintenance and renovation project, the construction of a new victory, "jack up drilling platform, and signed a strategic cooperation agreement in the last year," victory five "is CIMC Raffles and Sinopec once again joined the joint and cooperation achievements.
Up to now, already CIMC Raffles delivered a total of 8 semi submersible drilling platform, 11 jack up drilling platform, and other types of marine engineering equipment, a total of 36.