传真:021-61553650
手机:13788995407
邮箱:sales@sh-zbfm.com
地址:上海市宝山区宝杨路1800号
It is reported that the party members, the Ministry of land and Resources Bureau, China geological survey bureau Party Secretary Zhong Ziran attended the "marine geology ten" comprehensive survey ship launching ceremony and announced the "ocean ten" ship undocking launching, and COSCO heavy beam peak general manager, Dongguan Yu Li, vice mayor of Guanghai, Mr. Wen Ning bureau Party committee secretary other guests start pulling device.
Guangdong COSCO Shipping first system comprehensive geological survey ship successfully named water
In June 28, 2017, the first comprehensive geological survey ship designed by the Guangdong COSCO Shipping Bureau was designed and constructed by the China Geological Survey, and the marine geology No. ten ship (N703) was successfully named. The ship fills the gap of the small tonnage deep drilling marine geological drilling ship in our country, improves the ability of marine geological investigation, and also indicates that China's marine geological survey ability ranks among the world's leading position.
"Marine geology No. ten" was designed by the seven O group of China Shipbuilding Group in 2014. COSCO Guangdong shipyard completed detailed design and started construction in October 2015. The ship is a set of marine geology, geophysics, hydrology and environment and other functions as one of the means of investigation of comprehensive geological survey ship, the total length of 75.8 meters, 15.4 meters wide, 7.6 meters deep, the structure of draft of 5.2 meters, a displacement of about 3400 tons, endurance 8000 sea miles, the number 58, the electric propulsion rudder slurry two, dynamic positioning and other advanced navigation and control system, can realize the development of marine geological survey work in the global unlimited area. The ship is equipped with the first self-developed lifting type offshore drilling system in our country. Through design optimization and technological innovation, the drilling capacity can be doubled.
The ship also absorbed the latest achievements of the construction of the international investigation the same type of ship design, the international advanced survey technology through the introduction, integration, optimization and upgrading, modular equipment layout expedition, equipped with unmanned submersible cable (AUV), integrated navigation system, marine gravity and magnetic measurement system, single beam and the multi beam measurement system, shallow profile measurement system, seabed CPT system (CPT), high energy spark source system, four beam side scan sonar measurement system, ultra short baseline underwater acoustic positioning system, CTD detection system (CTD), deep water Doppler current flow measurement and survey system (ADCP) and the digital compass system of international mainstream, front-end survey of 20 sets of equipment, in the overall layout, the whole ship survey means of survey equipment compatible with aspects of performance improvement, reflecting the high accuracy, Multi function, comprehensive operation ability and so on.
Guangdong COSCO Shipping first system comprehensive geological survey ship successfully named water
船用阀门www.sh-zbfm.com
Ship design and construction at the beginning of this year, Guangdong COSCO initiative and shipowners, classification societies, design institutes, equipment suppliers more than 30 thematic discussions and consultations for the design difficulties of the project together to select the best scheme, give counsel, overcome because of the overall small scale brings the system of equipment layout, equipment electromagnetic compatibility, many problems such as noise control, to achieve the best in the design of ship performance theory. COSCO Shipping in Guangdong is committed to become a leading domestic and world-class small ship, special ship, engineering ship construction expert."
In the stage of construction, Guangdong COSCO shipyard production departments to carry out full production preparation, and to "learn a two" study and education activities as the starting point, to "boutique and talents" as the guiding ideology of establishing project joint party branch and set up a flag of young commandos, fully mobilize the enthusiasm and creativity of the pioneer members of the project take the lead role of backbone and youth group. According to the characteristics of the ship, the young commandos were set up precision control group, research group, plate drilling system equipment group, survey equipment group, a number of special lifting equipment group group, joint research to solve the problem a lot of the actual construction process, the final ship launching integrity reached 95%, created the Guangdong COSCO shipyard the new ship was the highest and most new record of integrity, has reached the leading domestic level.
"Marine geology No. ten" after the water will enter the outfitting and equipment of sea trial stage, is expected at the end of this year, with the "marine geology No. eight", "marine geological survey ship into the column with nine" put into use. Then, with the existing "ocean No. six", "sea No. four", "treasure", "struggle No. four", "fight No. five", "Zhi Zheng industry" survey ship together, constitute Chinese geological survey coverage of shallow water, deep water and ocean waters and marine geological survey ship equipment for the detection system, Chinese geological survey will form a new pattern of the ship into the sea 9.