欢迎光临我们的网站!公司简介 | 联系我们

质邦阀门-专业生产加工、定做各种船用阀门和附件

上海质邦阀门制造有限公司
全国服务电话 全国服务电话 021-61553650
产品展示
联系我们
全国服务电话:021-61553650

传真:021-61553650

手机:13788995407

邮箱:sales@sh-zbfm.com

地址:上海市宝山区宝杨路1800号

708所“精铟一号”正式交付自升式风电安装平台
发布时间:2017-05-22 12:18 来源:未知
In May 18, 2017, the "refined indium 1" held a delivery ceremony in Guangzhou Nansha jack up wind power installation platform, the platform is designed by seven ships of the O eight R & D, the first KOE01 shipbuilding group Whampoa  Wenchong ship Co., Ltd. Guangdong fine indium ocean engineering Limited by Share Ltd to build the jack up wind electrical installation platform. Seven, O eight deputy director Li Xiaoping, vice chief engineer dragon attended the delivery ceremony. The ship is another masterpiece of the Dragon Master studio.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
It is reported that the "refined indium 1" platform is built for installation and maintenance design for each wind farms along the coast of China, the maximum operating depth of 45 meters, equipped with a 800 ton crane revolving around the pile and four sets of JYM-HJ3600 hydraulic bolt type continuous lifting system, can 7MW offshore wind turbine installation of the new generation the construction ability of 650 tons of single pile of pile foundation.MARINE VALVE www.sh-zbfm.com
The platform will be at the end of May in the Jiangsu coastal wind farm was officially put into use, at least a year for China's offshore wind power with 200 thousand kilowatts of new installation service.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
In recent years, seven O eight has made technical breakthroughs in the design of offshore wind power platform, and has successfully delivered 3 type 3 wind power installation ships, and 4 type 5 wind power installation platforms are under construction.
Wind power installation vessel with bottom function from the early, to jack up wind power installation platform, and then to the self lifting self-propelled wind power integration platform at present, have better service to customers in the market, leading the technology development trend.MARINE BUTTERFLY VALVE www.sh-zbfm.com
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform
Through continuous innovation, seven O eight currently has a lifting capacity of 250 tons, 350 tons, 500 tons, 800 tons, 1000 tons and 1200 tons of wind power installation vessel series ship research and development capabilities, achieve full coverage of the wind power installation vessel mainstream ship type, the formation of such products of independent design ability.
In 2009, the offshore wind power was still in its infancy in China. The seven O eight designed the 350 ton ocean No. 36 sitting bottom type and 250 ton ocean No. 38 self elevating type two wind power installation ship for Nantong ocean water construction.
Seven O eight, "refined indium No. 1" delivered by self elevating wind power installation platform船用蝶阀www.sh-zbfm.com
Will ship this month to the end of the "Three Gorges ship Fu" in loading, navigation, dynamic positioning, lifting capacity, lifting capacity plays and structure design have reached or exceeded the domestic operating level of products.